About your inspection

Please select your inspection type

Single Story Package

Our single storey inspection package combines our Slab Inspection, Plate Height Inspection, Roof Frame Inspection and Practical Completion Inspection.

SLAB INSPECTION

  • Slab dimensions
  • Slab thickness
  • Plumbing & electrical pre-lay location on slab
  • Cracking (acceptable)
  • Step down to wet areas
  • Level
  • Finish

SUSPENDED SLAB INSPECTION

  • Slab dimensions
  • Slab thickness
  • Plumbing & electrical pre-lay location on slab
  • Upturn / downturn beam dimensions
  • Cracking (acceptable)
  • Step down to wet areas
  • Level
  • Finish

PLATE HEIGHT INSPECTION

  • Brickwork bonding & sufficient mortar in place
  • Workmanship facebrick
  • Window & door frames installed plumb & square & are in the correct location, within reason, as per plans
  • Flashings & weep holes installed
  • Room dimensions & openings are of similar size to approved plans
  • Wet area rooms are square
  • If possible, check that lintels have a minimum bearing
  • If possible, check that brick lintels have a minimum bearing
  • Wall heights
  • Wire tie spacing
  • Window ties/straps
  • Stiffening Columns
  • Site welding
  • Insulation
  • Walls are ready for next trade
  • Holding down straps & tie down points installed
  • Other timber/steel frame &/or composite wall system (Masterwall)

ROOF FRAME INSPECTION

  • Holding down straps & tie down points fixed to roof frame
  • Ceiling joists
  • Ceiling joist trimmers
  • Hangers
  • Counter beams
  • Timber/Metal roof battens
  • Ridge
  • Rafters
  • Under-purlins
  • Struts
  • Collar ties

SECOND STOREY ROOF FRAME INSPECTION

  • Holding down straps& tie down points fixed to roof frame
  • Ceiling joists
  • Ceiling joist trimmers
  • Hangers
  • Counter beams
  • Ridge
  • Rafters
  • Under-purlins
  • Struts
  • Photos of areas inspected
  • Photos and required action for defects and issues
  • Same Day Reporting
  • Full Inspector Debrief

SECOND STOREY BRICKWORK INSPECTION

  • Brick work bonding & sufficient mortar in place
  • Workmanship facebrick
  • Window & door frames installed plumb & square & are in the correct location, within reason, as per plans
  • Flashings & weep holes installed
  • Room dimensions & openings are of similar size to approved plans
  • Wet area rooms are square
  • If possible, check that lintels have a minimum bearing
  • If possible, check that brick lintels have a minimum bearing
  • Wall heights
  • Cavity dimensions & clean
  • Wire tie spacing
  • Window ties/straps
  • Stiffening columns
  • Site welding
  • Insulation
  • Walls are ready for next trade
  • Holding down straps & tie down points installed
  • Other timber/steel frame &/or composite wall system (Masterwall)

HANDOVER PRACTICAL COMPLETION INSPECTION

  • Fire separation: separating walls underside of roof covering
  • Wet area & external balcony: floor wall junctions, penetrations in shower, bath to wall, floor wastes
  • Wall & floor tiling: workmanship, corner joints, adhesion, falls to floor waste
  • Shower screens & mirrors: workmanship, fixings
  • Stairs: riser & going dimensions
  • Insulation: sarking & ceiling insulation
  • Internal plaster: set - hardness, curing & workmanship
  • Ceilings & wall plasterboard linings: fixings, back blocking, workmanship & cornices
  • Cabinets: workmanship, fixings, install level & plumb. Penetration sealing
  • Benchtop sealing. Rangehood distance from hotplate
  • Fixing carpentry: internal & external doors: gaps/alignment, door furniture, skirtings & architraves
  • Labelling & safety markings
  • Windows: labelling safety markings, restricted opening two storey
  • Roof tiles: installation, fixing centres
  • Adequate use of pointing - hip & ridge tiles
  • Roof sheeting: fixing, including ridges & hips
  • Penetrations
  • Gutters joins clips
  • Downpipes; location, joins spacing & clips
  • Windows
  • Balustrade: structure & handrails. Height & spacing
  • External render/acrylic: ground level finish & workmanship
  • Paving: concrete/brick – workmanship, edge restraint, steps & falls
  • Patio/pergola – other exterior structures. Workmanship
  • Fences & gates: workmanship
  • Stormwater drainage: connection to downpipes
  • Retaining walls
  • Termite durable notice: installation of notice
  • Light points. Power points
  • Kitchen appliances basic functions
  • Air conditioning: cold & hot operation
  • Ventilation: exhaust fan & rangehood ducted to outside air
  • Garage door: operation
  • Location & number of smoke alarms & RCD's
  • Hot & cold tap operation. Drains clearing as expected
  • Operation of plumbing fixtures. E.g. Toilet
  • Photos of areas inspected
  • Photos and required action for defects and issues
  • Same Day Reporting
  • Full Inspector Debrief

Double Story Package

Our double storey inspection package combines all of our individual inspections with extras for double storey house.

SLAB INSPECTION

  • Slab dimensions
  • Slab thickness
  • Plumbing & electrical pre-lay location on slab
  • Cracking (acceptable)
  • Step down to wet areas
  • Level
  • Finish

SUSPENDED SLAB INSPECTION

  • Slab dimensions
  • Slab thickness
  • Plumbing & electrical pre-lay location on slab
  • Upturn / downturn beam dimensions
  • Cracking (acceptable)
  • Step down to wet areas
  • Level
  • Finish

PLATE HEIGHT INSPECTION

  • Brickwork bonding & sufficient mortar in place
  • Workmanship facebrick
  • Window & door frames installed plumb & square & are in the correct location, within reason, as per plans
  • Flashings & weep holes installed
  • Room dimensions & openings are of similar size to approved plans
  • Wet area rooms are square
  • If possible, check that lintels have a minimum bearing
  • If possible, check that brick lintels have a minimum bearing
  • Wall heights
  • Wire tie spacing
  • Window ties/straps
  • Stiffening Columns
  • Site welding
  • Insulation
  • Walls are ready for next trade
  • Holding down straps & tie down points installed
  • Other timber/steel frame &/or composite wall system (Masterwall)

ROOF FRAME INSPECTION

  • Holding down straps & tie down points fixed to roof frame
  • Ceiling joists
  • Ceiling joist trimmers
  • Hangers
  • Counter beams
  • Timber/Metal roof battens
  • Ridge
  • Rafters
  • Under-purlins
  • Struts
  • Collar ties

SECOND STOREY ROOF FRAME INSPECTION

  • Holding down straps& tie down points fixed to roof frame
  • Ceiling joists
  • Ceiling joist trimmers
  • Hangers
  • Counter beams
  • Ridge
  • Rafters
  • Under-purlins
  • Struts
  • Photos of areas inspected
  • Photos and required action for defects and issues
  • Same Day Reporting
  • Full Inspector Debrief

SECOND STOREY BRICKWORK INSPECTION

  • Brick work bonding & sufficient mortar in place
  • Workmanship facebrick
  • Window & door frames installed plumb & square & are in the correct location, within reason, as per plans
  • Flashings & weep holes installed
  • Room dimensions & openings are of similar size to approved plans
  • Wet area rooms are square
  • If possible, check that lintels have a minimum bearing
  • If possible, check that brick lintels have a minimum bearing
  • Wall heights
  • Cavity dimensions & clean
  • Wire tie spacing
  • Window ties/straps
  • Stiffening columns
  • Site welding
  • Insulation
  • Walls are ready for next trade
  • Holding down straps & tie down points installed
  • Other timber/steel frame &/or composite wall system (Masterwall)

HANDOVER PRACTICAL COMPLETION INSPECTION

  • Fire separation: separating walls underside of roof covering
  • Wet area & external balcony: floor wall junctions, penetrations in shower, bath to wall, floor wastes
  • Wall & floor tiling: workmanship, corner joints, adhesion, falls to floor waste
  • Shower screens & mirrors: workmanship, fixings
  • Stairs: riser & going dimensions
  • Insulation: sarking & ceiling insulation
  • Internal plaster: set - hardness, curing & workmanship
  • Ceilings & wall plasterboard linings: fixings, back blocking, workmanship & cornices
  • Cabinets: workmanship, fixings, install level & plumb. Penetration sealing
  • Benchtop sealing. Rangehood distance from hotplate
  • Fixing carpentry: internal & external doors: gaps/alignment, door furniture, skirtings & architraves
  • Labelling & safety markings
  • Windows: labelling safety markings, restricted opening two storey
  • Roof tiles: installation, fixing centres
  • Adequate use of pointing - hip & ridge tiles
  • Roof sheeting: fixing, including ridges & hips
  • Penetrations
  • Gutters joins clips
  • Downpipes; location, joins spacing & clips
  • Windows
  • Balustrade: structure & handrails. Height & spacing
  • External render/acrylic: ground level finish & workmanship
  • Paving: concrete/brick – workmanship, edge restraint, steps & falls
  • Patio/pergola – other exterior structures. Workmanship
  • Fences & gates: workmanship
  • Stormwater drainage: connection to downpipes
  • Retaining walls
  • Termite durable notice: installation of notice
  • Light points. Power points
  • Kitchen appliances basic functions
  • Air conditioning: cold & hot operation
  • Ventilation: exhaust fan & rangehood ducted to outside air
  • Garage door: operation
  • Location & number of smoke alarms & RCD's
  • Hot & cold tap operation. Drains clearing as expected
  • Operation of plumbing fixtures. E.g. Toilet
  • Photos of areas inspected
  • Photos and required action for defects and issues
  • Same Day Reporting
  • Full Inspector Debrief

Do you also need?

$750.00
Add Remove
Practical Completion occurs once the home reaches its intended use, i.e., habitation. This is also the milestone linked to the final payment and key handover. A Practical Completion Inspection, or Handover Inspection, occurs just before actual handover. It is your last chance to ensure everything is up to standard before the builder hands over the project. This inspection can be purchased as a standalone inspection at the end of your build process or as part of our Construction Inspection Package.
Construction Progress inspection

Double Storey Roof Frame Inspection

$450.00

Construction Progress inspection

Double Storey Roof Frame Inspection

$450.00

Order Total:

Price is based on 1 dwelling under 450m2. Larger homes or multiple dwellings will incur an additional fee. Our team will be in contact should this be required.

About your inspection

About you

Additional services

Payment

  • About you
  • About your inspection
  • How did you hear about us?
  • Payment

Hi there, 

We see you have added an Electrical, Plumbing and Gas inspection (EPG) with a Pre-Settlement inspection. 

Please note these are very similar inspections, just performed at different times. The EPG occurs during your pre-purchase inspection, while the Pre-Settlement occurs 5-7 days before settlement. 

If you require both please proceed to check out. Alternatively, remove one and continue.

If you would like further information, please call our office before proceeding to check out on (08) 6184 5624